Monday, April 19, 2010

Bathroom Tile


Finished with the tile now, and the fixtures are installed and operating perfectly.

Wednesday, April 14, 2010

Bathroom


Overall bathroom interior elevations. I'll have to see how close I get to this when it's all said and done.

Monday, April 12, 2010

Bathroom Tile


We only have one wall left and then we can grout the bathroom tile. I will take a better picture once it is all done.

Bathroom Tile


Getting the tile put up.

Dumpster Rental


We have finally gotten rid of the indiscribable smell of termite damaged walls and metal lathe that has been fillin our garage for the last 6 months. It's great to be able to use the garage now rather than the living room to cut all our drywall and 2x4's. It was so heavy that one wheel has started to sink into the asphalt driveway.