Monday, May 24, 2010
Sunday, May 23, 2010
Bathroom Progress
Wednesday, May 19, 2010
Wednesday, May 12, 2010
Bathroom Progress
The plywood baking for the cedar is up and painted now. The hope is that once the cedar is attached with the exposed stainless steel fasteners to the plywood that it will have a floating effect.
In the end I hope to acheive contrast by having the lighter, warmer, rough materiality of cedar act as an accent off of the heavier solid grey materials.
Bathroom Progress
I purchased almost all my cedar for the additional layer of bathroom material. I finished applying 2 coats of a great product I was lured to - Tung Oil. I thought polyurethane was the only way to get a great finish, but this solvent really brings out a more natural look of the wood without as much sheen. Now to just wait on the tile we ordered for the backsplash so I can put that on the wall then install the Cedar and the Mirror.
Monday, May 3, 2010
Bathroom Progress
We now have the bathroom floor coated nicely with an epoxy and I got the new bathfan/light on 2 seperate switches and moved my old wall sconce into a series of mini can lights with a switch. I also moved the switch box to actually be inside of the bathroom rather than the single switch for the single light that was oddly placed in the hallway. Now just the final layer needs to be developed.